The accommodation is arranged in two parallel blocks: a nine-storey building facing Empire Way and an eighteen-storey building positioned at the rear. The ground floor along Empire Way houses entrances to both the leisure centre and student housing, activating the Wembley streetscape. The exterior of the building combines prefabricated brick slip panels, aluminium rainscreen panels, render, and Glass Reinforced Concrete, contributing to a varied and durable façade. The entire project, including the modular steel-framed construction of the student rooms, was completed in just 14 months using the innovative Vision Modular Structures system.